BPA
was the Designer of the SR 836/NW 57th
Av Interchange Modifications.
Construction was recently completed,
allowing an additional 4th WB thru-lane to
provide temporary traffic relief until
the proposed redesign of SR 836 which is
anticipated to be completed by 2012 or
later.
The $3.2 Million project, together with the
Westbound auxiliary lane between NW 57th
Avenue and NW 72nd Avenue, will
be necessary for traffic control during the
SR 826/836 interchange reconstruction. The
SR 826/836 interchange reconstruction
project is one of the largest undertaken by
the Florida Department of Transportation –
District 6
and is anticipated to begin
construction in late 2008 at a construction
cost of over $500 M.
|