Bolton, Perez & Associates
was responsible for the design and
construction inspection, including South
Florida Water Management District (SFWMD)
right-of-way permitting for the new 90-foot,
3-span continuous concrete flat slab bridge
structure over the C-103 Canal at Waterstone
Way. The bridge is founded on 18-inch pile
bents that support a continuous 18”
reinforced concrete deck with span
arrangements of 27-36-27 and carries two
lanes of traffic. The bridge also supports
the utility crossings and decorative roadway
lighting.
|
|