Bolton, Perez & Associates
currently provides District 6 of the Florida
Department of Transportation Construction
Engineering and Inspection services for the
Consultant Residency contract.FDOT
utilizes The CEI Consultant Residency
contract to manage numerous construction
contracts ranging in value from $ 250,000 up
to $ 6,000,000. Up to 12 active projects
are managed by the CEI Consultant Residency
at one time, including fast response
Pushbutton contracts. BPA is responsible
for the overall performance and operation of
this contract.The Residency currently
requires a Sr. Project Engineer supported by
3 Project Administrators, 2 Contract Support
Specialists, and the full compliment of Sr.
Inspectors, Inspectors and support staff.
Projects completed by the
Residency in 2007 include:
-
407736-4 Miami Gardens Dr. –
Intersection Improvements $ 400,000
-
412754-3 West Dixie Highway Landscaping
$ 370,000
-
412471-1 NW 27th Ave. Resurfacing from
NW 203rd Street to NW 215th Street $
1,800,000
-
410679-3 I-95 Landscaping from NW 132nd
Street to NW 154th Street $ 950,000
-
407630-2 Sunny Isles Blvd. Resurfacing
from US-1 to NE 35th Ave $ 2,700,000
-
249835-5 Biscayne Blvd. Landscaping
from NE 5th Street to NE 13th Street $
600,000
-
417914-1 NW 103rd Street Resurfacing
from W 2 Ave. to E 10th Ave $1,700,000
-
407577-3 NW 103rd Street Intersection
Improvements $1,600,000
-
250173-2 NW 7th Ave. Intersection
Improvements and Landscaping $ 1,780,000
-
414688-2 NW 27th Ave. Landscaping $
185,000
-
416472-1 Brickell Ave. from SE 13th
Street to SE 15th Street - Intersection
Improvements $ 615,000
-
418236-1 NW 27th Ave / SW 8th St./ SW
12th Ave. Pedestrian Improvements $
1,060,000
-
418236-3 SW 40th St./ SW 88th St
Pedestrian Improvements $ 1,170,000
-
418238-1 NW 7th Ave./ NW 27th Ave./ NW
119th Street – Intersection
Improvements $ 790,000
-
416421-2 Coral Way Sidewalk Replacement
SW 25th Ave. to SW 3rd Ave. $ 600,000
-
416421-2 Coral Way Sidewalk Replacement
SW 25th Ave. to SW 3rd Ave. $ 600,000
|