Home Services Corporate Info Qualifications Employment Contact

 

 

Bridge Design

Bolton Perez & Associates provides complete structural engineering services for a full spectrum of transportation structures.  Our experience includes structural design of bridges including concrete segmental bridges, pre-stressed AASHTO girder bridges, steel plate girders, and steel box girder bridges.  We also provide full structural engineering services for buildings and other miscellaneous structures.  Our experience is broad and varies from pedestrian bridges to multi-story structures to remedial structural design.

Recent Projects

Palmetto Expressway/I-75 Interchange

(Ramp A)

57th Avenue Interchange Modification

Waterstone Way Bridge-New Construction

Campbell Drive Bridge-Widening

Sonovoid Bridge Repair and Rehabilitation

Waldin Drive over C-103-Widening

Flamingo Road Bridge-Bridge Replacement

Naranja Lakes Bridge-New Construction

SW 136th Street Bridge Over Black Creek Canal-New Construction

Bay Point Bridge-Bridge Load Rating

Under a sub-consultant agreement BPA was responsible for the Fast-Tract development of final contract documents for the Florida Department of Transportation’s widening of this 3016’ long concrete segmental box girder viaduct.  The work consisted of adding 3’-8” to each side of the box girder concrete deck slab, adding bottom longitudinal post-tensioning in 9 spans, andre-striping the bridge for two lanes of traffic.  The plans were completed in three months and bid results were within 1% of the engineer’s estimate.

 

 

  

 

 

 

  Quick Links  
  BPA Miami News  
  CEI Services  
  Civil/Highway  
Structural Services
Coatings & Waterproofing
Planning Services
Transit Services
Qualifications
Profile : John Bolton
Profile : Jake Perez